Grenfell: Building a Disaster- Ep 6: Value Engineering

When Grenfell resident Ed Daffarn first heard about the multimillion pound refurbishment of the tower, he welcomed it. The estate had, in his view, become increasingly run down in recent years.But as the refurbishment progressed, he says residents felt their voices weren’t heard. Meanwhile architects and contractors selected materials which would burn easily in a fire.Kate looks at how cost-cutting and a race to the bottom in the construction industry had devastating consequences for the refurbishment of Grenfell Tower.Presenter: Kate Lamble Producer: Josephine Casserly Production coordinator: Janet Staples Audio engineers: James Beard and Gareth Jones Story consultant: Simon Maybin Editor: Penny Murphy

Om Podcasten

A new 10-part series about the Grenfell Tower fire and why it happened. Missed opportunities, unheeded warnings and state failure to protect its citizens. What a fire in west London that killed 72 people shows us about how Britain works, and doesn't.